工程英语翻译
的有关信息介绍如下:Building the ring set fire engines, in the cities along the eastern side of the road surface at the northwest corner of the entrance and fire engines were able to enter. ** According to the local norms, to meet the length of the building around 1 / 3 to fight the fire side of the request (because of the city of Chongqing is a mountainous city, surrounding the construction done for the length of 1 / 3 are really hard, you can not consecutive). The project area has three shopping malls in a row not to fight the fire area, with a total length of the circumference of more than 1 / 3, Road fire engines from the inside edge of the wing wall construction materials to highlight the edge of not less than 5.00m, and fire engines to meet the Road Fire The largest car turning radius of 12m, to fight the fire site with a width of 18m, and this is not tall tree planting; and fire fighting facilities of not more than 5% of the slope, fire engines, fire fighting facilities should be able to carry a large set of fire engines Weight; Combined air-conditioning unit: for department stores, supermarkets, large bays, such as the lobby room, a new unit set up wind, ventilation and air return, setting up a new, back to the wind and the proportion of exhaust valve, according to the outdoor temperature of the new regulation, the ratio of air return, Back to the water main unit based PI control valve and in accordance with return air-conditioning temperature valve opening. (Modular air-conditioning units at all levels of the engine room air-conditioning)下次不会的用谷歌在线翻译